BCN Marathon Challenge 2014: The Tame Valley Canal, as one of the last parts of the BCN to be built, has a dead straight summit level. The embankment is followed by a deep cutting. Chimney Bridge, carrying Green Lane over the canal, can just be seen through the foliage.
Birmingham Canal Navigation,


United Kingdom,
on 24 May 2014 at 14:43, image #133

Photo 1405241443271D48163HaraldJoergens
BCN Marathon Challenge 2014: The Tame Valley Canal, as one of the last parts of the BCN to be built, has a dead straight summit level. The embankment is followed by a deep cutting. Chimney Bridge, carrying Green Lane over the canal, can just be seen through the foliage. Birmingham Canal Navigation, United Kingdom, on 24 May 2014 at 14:43, image #133


  • ·