Photo 1505231005481D44612HaraldJoergens
BCN 24h Marathon Challenge 2015: The eastern end of a small loop that ran parallel to the canal.From here, a longer canal arm served Cornwall Engineering Works.
Birmingham Canal Navigations,
on 23 May 2015 at 10:05, image #54