- Home
- »
- Galleries
- »
- Canal and Waterway Events
- »
- 2015 BCN Marathon Challenge Photos
- »
- Photo 1505231002075D20095HaraldJoergens
Photo 1505231002075D20095HaraldJoergens
BCN 24h Marathon Challenge 2015: BCN New Main Line at Rabone Lane Bridge, with French Walls Basin Bridge on the left. Almost opposite, on the right, is the site of a former basin that served gas works.
Birmingham Canal Navigations,
on 23 May 2015 at 10:02, image #51