BCN 24h Marathon Challenge 2015: The BCN New Main Line (east of Winson Green Junction) - wide, straight, and with towpaths on both sides. The factory bridge on the left once served the Cape Arm. Photos of the current state of the Cape Arm are planned for Autumn 2015.
Birmingham Canal Navigations,



on 23 May 2015 at 09:50, image #45

Photo 1505230950415D20069HaraldJoergens
BCN 24h Marathon Challenge 2015: The BCN New Main Line (east of Winson Green Junction) - wide, straight, and with towpaths on both sides. The factory bridge on the left once served the Cape Arm. Photos of the current state of the Cape Arm are planned for Autumn 2015. Birmingham Canal Navigations, on 23 May 2015 at 09:50, image #45


  • ·