BCN Marathon Challenge 2013: NB "Feloinious Mongoose" in Coseley Tunnel on the BCN New Main Line. The tunnel, opened 1837 as a wide tunnel with towpaths on both sides, was built for the high traffic volume on the New Main Line, and to cut off the long and winding Wednesbury Oak Loop..
Birmingham Canal Navigation,


United Kingdom,
on 25 May 2013 at 15:04, image #205

Photo 1305251504305D25697HaraldJoergensE2510
BCN Marathon Challenge 2013: NB "Feloinious Mongoose" in Coseley Tunnel on the BCN New Main Line. The tunnel, opened 1837 as a wide tunnel with towpaths on both sides, was built for the high traffic volume on the New Main Line, and to cut off the long and winding Wednesbury Oak Loop.. Birmingham Canal Navigation, United Kingdom, on 25 May 2013 at 15:04, image #205


  • ·