BCN Marathon Challenge 2013: The pond between Spon Lake Top Lock and the middle lock on the junction between the Old Main Line and New Main Line, with a heron adding to the peaceful scenery. On the left hand side of the canal Bromford Colliery used to have two branches, perhaps not that peaceful at the time!.
Birmingham Canal Navigation,


United Kingdom,
on 25 May 2013 at 12:39, image #167

Photo 1305251239035D25494HaraldJoergens
BCN Marathon Challenge 2013: The pond between Spon Lake Top Lock and the middle lock on the junction between the Old Main Line and New Main Line, with a heron adding to the peaceful scenery. On the left hand side of the canal Bromford Colliery used to have two branches, perhaps not that peaceful at the time!. Birmingham Canal Navigation, United Kingdom, on 25 May 2013 at 12:39, image #167


  • ·