BCN Marathon Challenge 2013: The BCN New Main Line between Avery Rail Bridge and Rabone Lane Bridge. On the right, Avery Basin, a canal loop that was part of the Old Main Line, joins the New Main Line again..
Birmingham Canal Navigation,


United Kingdom,
on 25 May 2013 at 08:48, image #81

Photo 1305250847501D42139HaraldJoergens
BCN Marathon Challenge 2013: The BCN New Main Line between Avery Rail Bridge and Rabone Lane Bridge. On the right, Avery Basin, a canal loop that was part of the Old Main Line, joins the New Main Line again.. Birmingham Canal Navigation, United Kingdom, on 25 May 2013 at 08:48, image #81


  • ·